The environmental impact assessment of the project is entrusted to Liaoning Tanglong Technology Consulting Co., Ltd. According to the measures for public participation in environmental protection, in order to facilitate the public to understand the relevant information of the environmental impact assessment conclusion of the project, the second publicity is now carried out, as follows:
1、 Construction project
Project Name: 30000 T / a ethylene oxide derivative technical transformation project of Liaoning Xindun pharmaceutical and Chemical Co., Ltd
Construction nature: technological transformation construction location: in the high tech Industrial Park of Dongzhou District, Fushun City
Construction content: annual output of 1000 tons of fatty alcohol polyoxyethylene ether, 19000 tons of polycarboxylic acid water reducer macromonomer, 9400 tons of medicinal polyethylene glycol series products, 500 tons of medicinal S-40 ester and 100 tons of industrial surfactant.
2、 Internet links to the full text of the draft for comments on the environmental impact report and ways and means of consulting the paper report
Internet link address of the full text of the exposure draft of the environmental impact report:
Link: https://pan.baidu.com/s/1pCaFTFbeE8GMvLK5VAPrgg Extraction code: b31j
Ways and means to consult the paper report: the public can go to Liaoning Xindun pharmaceutical and Chemical Co., Ltd. to consult the report.
3、 Public scope for comments
Residents near the project, as well as any experts, scholars, government staff and ordinary people who are concerned about the construction of the project.
4、 Public Participation Questionnaire network link
Network link address: https://pan.baidu.com/s/1prwbLlCOg6QtyJ63JZf2Kg Extraction code: 4am8
5、 Main ways and means of public opinions
The public can submit the public participation questionnaire to the construction unit by telephone, letter, e-mail, etc.
Construction unit: Liaoning Xindun pharmaceutical and Chemical Co., Ltd. contact person: factory director Li Tel.: 1332212993
6、 Starting and ending time of public comments
The public can put forward opinions and suggestions to the construction unit within 10 working days after the announcement is issued.
email:lnxdyh@163.com fax:024-56090088